Date:    11-1-2018
Number of Hours:    3.50
Brief Description:    Install left wing leading edge
Removed tape from right wing leading edge installation.

Cleaned, prepped and epoxied in place the left wing leading edge.

Rough installed the right wingtip mounting flange, top side. Note: will use flush mount 3/16" aluminum rivets vs. the standard 1/8" rivets in order to maximize SEDs.