| Date: |
11-1-2018 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Install left wing leading edge |
|
|
Removed tape from right wing leading edge installation. Cleaned, prepped and epoxied in place the left wing leading edge. Rough installed the right wingtip mounting flange, top side. Note: will use flush mount 3/16" aluminum rivets vs. the standard 1/8" rivets in order to maximize SEDs. |
||