| Date: |
10-31-2018 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Installed the leading edge, right wing |
|
|
The epoxy came in today (using the automixing applicator) and I was able to mount the leading edge on the right wing panel. Also, started laying out wing tip attaching flanges and drilling for installation (left wing). |
||