| Date: |
10-17-2018 |
|
| Number of Hours: |
3.10 |
|
| Brief Description: |
Installed thel #2 Ribs |
|
|
Determined stand off spacer sizes to produce the correct rib profile for the number 2 ribs along the bottom of the fuel tanks and epoxied in place. |
||