| Date: |
7-4-2012 |
|
| Number of Hours: |
3.30 |
|
| Brief Description: |
Fuel Tanks |
|
|
Drilled the T-813 capacitance plates to the #2 and #6 ribs for both tanks. Deburred holes and installed nutplates. Notched eight 1/4" snap bushings to allow sender wires to pass through. Located and drilled the vent line holes 7/16" for AN-833 bulkhead elbow fittngs on inboard ribs for both tanks. Also located and drilled BNC connector holes 3/8". Before starting sealing, I still have to match drill and countersink the fill and drain fittings to the skin, then dimple/countersink the skin, ribs, and stiffeners. Rivets Today: 24 Rivets Total: 2817 |
||