Date:    3-3-2012
Number of Hours:    0.30
Brief Description:    Right Elevator
Finished up the right elevator by installing and setting the height of the two hinge bearings. As before, using boelube on the threads eased the installation. I left the jam nuts loose until I can check the alignment of both elevators together.