| Date: |
12-30-2011 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Horzontal Stabilizer Ribs and Left Skin |
|
|
Deburred edges, squared flanges, and straightened (fluted) all HS ribs. Assembled and final drilled ribs to front and rear spars. Installed left HS skin onto skeleton. Match drilled inboard ribs to left spars and skin. Match/final drilled al rib and sparl holes in left HS skin. Rivets this session: 0 Rivets total: 6 |
||