| Date: |
12-18-2011 |
|
| Number of Hours: |
9.50 |
|
| Brief Description: |
Horizontal Stabilizer Spars and Ribs |
|
|
Match drilled rear spar reinforcement bars to rear spar channels. Enlarged HS-708 rib holes in rear spar assembly to #21. Located and match drilled elevator hinge brackets to rear spar assembly. Located and match drilled VA-146 center elevator bearing to center hinge brackets. Primed and VA-146 with Tempo Zinc Chromate and riveted to center hinge brackets. Drilled HS-710 and HS-714 front spar reinforcement angles to HS-702 front spar channels. Tapered and rounded ends of front spar reinforcement angles. Bent ends of front spar reinforcement angles to 6 degrees. This was a tediouis process! Notched and trimmed ends of front spar channels to RV-7 dimensions. The notches are started by locating and drilling holes in the middle of a bend radius - another tedious process! Deburred all edges of front spar channels. Bent front spar channel tabs to 6 degrees and test fit to reinforcement angles. After a bit of tweaking all is well. Marked all HS ribs as left and right, using a "vibrating pencil". Layed out and drilled #40 front spar attach holes in front flange of HS-405 inboard main ribs. Rivets this session: 6 Rivets total: 6 |
||