| Date: |
9-26-2020 |
|
| Number of Hours: |
0.90 |
|
| Brief Description: |
Aft Fuselage Repair |
|
|
Installed F-710B with 7 of 11 rivets. The outboard two on each side will require the use of an offset rivet set, and I’d prefer to use that set with both hands and a helper to buck. I also fabricated, fit, and deburred the edges of the F-710C spacer. Rivets Today: 7 Rivets Total: 11973 |
||