| Date: |
10-17-2019 |
|
| Number of Hours: |
3.70 |
|
| Brief Description: |
Aft Fuselage Repair |
|
|
Due to already having to replace the F-710B angle once and having to upsize to -5 rivets, and the fact that one of those is a figure eight, I decided to replace the F-710 bulkhead. I fabricated a new F-710B HS attach angle but left it with a slight interference fit and will refine the fit after replacing the bulkhead. Removed rivets securing the F-710 bulkhead from the longerons down to the bottom J-stringer on both sides. The rest will require either working from under the fuselage or rolling the fuselage over. Rivets Today: -26 Rivets Total: 11939 |
||