| Date: |
11-22-2016 |
|
| Number of Hours: |
1.95 |
|
| Brief Description: |
Electric Flaps |
|
|
Riveted the nutplates and shim to the F-767 (photo 1), then riveted that assembly to the F-766A channel, and installed the channel in the fuselage (photo 2). Fit the flap motor to the F-766A channel and to the flap actuator. Clamped and match drilled the F-766B angle bracket to the channel. Deburred, prepped, and primed the angle and its faying surface on the channel. Rivets Today: 7 Rivets Total: 12031 |
||