| Date: |
4-11-2016 |
|
| Number of Hours: |
5.60 |
|
| Brief Description: |
Elevator Bellcrank Support and Bellcrank |
|
|
The next steps in the manual was to drill the F-728A vertical bellcrank support to the F-706 bulkhead, fabricate and install the F-728B reinforcement angle, and permanently install the support to the F-706 bulkhead. For reasons I don't recall, I had already installed the reinforcement angle and attached the support to the bulkhead and bottom skin. All I had left to do was attach the support at the top. To accomplish that, I first primed the faying surface on the F-706 (I had primed the F-728A previously), then dimpled both parts for the specified AN426-4 rivets. The instructions warned that riveting access would be tight, and that CS-4-4 rivets are acceptable. However, my no-hole squeezer yoke did a fine job on the solid rivets. The next job was to fabricate parts for the F-635 elevator bellcrank and associated parts. The plans and Chapter 4 of the build manual both say the F-635B spacer between the main bellcrank halves is to be fabricated out of flat stock. After spending a half hour or more looking for said stock, I noticed that the spacer is prefabricated with the bellcrank halves. All you have to do is cut them apart and deburr the edges. DUH! I wasted another hour or so looking for the 3/8 heavy wall tubing stock to make the bearing spacers. Thinking I'd found it, I made two spacers per plan only to find out I'd used 5/16 tubing instead of 3/8. Well, another hour-long search netted the proper material (in the last place I looked). The plans dimension spacers are nearly 1/16 too long for the stack up to fit in the designated space. I suspect that the steel washers were added somewhere back in history and the spacer dimension didn't get updated. The first round with the proper material failed because I miss-measured the stack up and ended up with about 0.040 side play. On the next round, I got one right, then got too aggressive with the belt sander and ended up short. Fortunately I finally got two good spacers before using up all the material, but just barely. Rivets Today: 4 Rivets Total: 11632 |
||