| Date: |
11-26-2014 |
|
| Number of Hours: |
2.10 |
|
| Brief Description: |
Center and Aft Fuselage Riveting |
|
|
Today I continued riveting the fuselage sides. I riveted the F-705 and the aft fuselage (baggage area) bulkheads on the right side, and from the F-706 back to the F-708 on both sides. I have a few rivets that need to be drilled out and replaced, but I'll wait until daytime when I have better light in the shop. I have not yet riveted the longeron "keeper" rivets on the aft fuselage. Rivets Today: 151 Rivets Total: 10750 |
||