Date:    11-26-2014
Number of Hours:    2.10
Brief Description:    Center and Aft Fuselage Riveting
Today I continued riveting the fuselage sides. I riveted the F-705 and the aft fuselage (baggage area) bulkheads on the right side, and from the F-706 back to the F-708 on both sides. I have a few rivets that need to be drilled out and replaced, but I'll wait until daytime when I have better light in the shop.

I have not yet riveted the longeron "keeper" rivets on the aft fuselage.

Rivets Today: 151
Rivets Total: 10750