| Date: |
5-14-2014 |
|
| Number of Hours: |
1.15 |
|
| Brief Description: |
Forward Fuselage |
|
|
Today I located and drilled the left outboard floor stiffener to the F-704 bulkhead, and drilled both outboard floor stiffeners to the bottom skin and the F-783B cover support ribs. I still need to drill them to the F-601J center engine mount angles, but I think I finally need to get a good angle drill before I attack that job. |
||