Date:    9-23-2006
Number of Hours:    2.50
Brief Description:    Installed landing gear.
Aligned and drilled top holes to secure gear legs into the weldments. Atached cross cables and forward cable. Aligned and drilled the front gear leg.Will do the 1 degree toe in at a later date.Sate in airplane for the first time. VERY COOL!!!!!even made some airplane sounds.