| Date: |
9-23-2006 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Installed landing gear. |
|
|
Aligned and drilled top holes to secure gear legs into the weldments. Atached cross cables and forward cable. Aligned and drilled the front gear leg.Will do the 1 degree toe in at a later date.Sate in airplane for the first time. VERY COOL!!!!!even made some airplane sounds. |
||