| Date: |
6-9-2010 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Left Ruddervator prep work |
|
|
Measured and marked rivet locations for ribs and rib root. Began drilling with #40 drill bit, used silver clecos initially. Followed up with #30 in some of the holes. Used copper clecos for those holes. |
||