Date:    6-9-2010
Number of Hours:    1.00
Brief Description:    Left Ruddervator prep work
Measured and marked rivet locations for ribs and rib root. Began drilling with #40 drill bit, used silver clecos initially. Followed up with #30 in some of the holes. Used copper clecos for those holes.