| Date: |
1-3-2006 |
|
| Number of Hours: |
8.20 |
|
| Brief Description: |
Rig Controls- hook up pitot system |
|
|
With Tim McLaughlin, Rigged flaps and ailerons. Verified travel. Adjusted to get positive stops. Hooked up Stratomaster to pitot tubes & verified operation. Wire tied tygon tubing into position under panel. |
||