| Date: |
10-3-2009 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Empenage |
|
|
Trimmed the horizontal stab spar to allow for clearance of the elevator control horn. Installed the top two Rod End Bearings in the rudder. Drilled the hole for the trim tab hinge pin safety wire. Empennage Complete except fiberglass |
||