| Date: |
8-15-2009 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Elevators |
|
|
Drilled out all the rivets on the right elevator and re-riveted with cherry max rivets for a better hold. Rolled and riveted the left elevator. Installed the rod end bearing on right elevator. |
||