| Date: |
7-11-2009 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Right and Left Elevator |
|
|
Put sealant in the trailing edge of the right and left elevator Finished riveting the bottom side of the right and left elevator |
||