| Date: |
7-9-2009 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Right Elavator |
|
|
Riveted e703 and e704 Riveted e610pp and e611pp and platenuts to the right elevator spar Riveted the e709 to the right elevator spar Riveted the e703 and e704 to the right elevator spar Riveted the e713 to the skin in 4 places Riveted the skin to the skeleton on bottom side only |
||