| Date: |
11-18-2008 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Vertical Stabilizer Spar and Ribs |
|
|
Clecoed the rear vertical spar and vertical spar stiffener together. Clecoed all 3 hinge brackets to the rear spar. Back drilled the 2 final holes on the upper VS410PP Prepared the 4 ribs. Fluted and deburred all ribs. Attached all ribs to the rear and forward vertical spar. Final Drilled the rear spar and all rib to spar attachments. |
||