Date:    7-5-2010
Number of Hours:    9.50
Brief Description:    Miscillaneous tasks/ELB,VHF antenna,jack pads
** Manufacture mount for ELB ,paint assembly and paint prior to installing in A/C
** Manufacture internal doubler plate and mount VHF antenna aft of L/H fuel tank,terminate coax cable and functional test of VHF radio
** I had two jack pads machined up from stainless steel and utilized the triangular steel gusset at the base of the landing gear leg socket to mount them.The jack pad has a 5/16" thread machined on the top of it and a self locking nut secures them.