| Date: |
7-5-2010 |
|
| Number of Hours: |
9.50 |
|
| Brief Description: |
Miscillaneous tasks/ELB,VHF antenna,jack pads |
|
|
** Manufacture mount for ELB ,paint assembly and paint prior to installing in A/C ** Manufacture internal doubler plate and mount VHF antenna aft of L/H fuel tank,terminate coax cable and functional test of VHF radio ** I had two jack pads machined up from stainless steel and utilized the triangular steel gusset at the base of the landing gear leg socket to mount them.The jack pad has a 5/16" thread machined on the top of it and a self locking nut secures them. |
||