Date:    5-24-2010
Number of Hours:    9.00
Brief Description:    Engine cowl rework
Engine cowl rework and fairing completed all edge gaps set and all 1/4 turn fasteners installed.10/32" anchors nuts installed on intake section of cowling.spinner temporarily installed for check fit.
Other miscillaneous jobs carried out today...
** Engine oil filter lockwired by the installation of a hose clamp on filter allowing lockwire to be attached and securred to engine.
**Final installation of hardware in boot cowl
**identify and mark pitot static plumbing
**Paint under surface of glare sheild matt black
**Manufacture and install fuel drain bracket and bulkhead fitting on firewall aft of oil cooler...hose to be manufactured
**Proseal bootcowl edge circumference to firewall to seal from cabin