| Date: |
3-21-2010 |
|
| Number of Hours: |
9.00 |
|
| Brief Description: |
cowling |
|
|
filled firewall to cowl gap with superfill, sanded to flush. shaped the inlets and spinner ring to match the prop spinner using a rasp and sandpaper. Re-drilled the attach screws at the fwd section of the cowl and added blind nuts. began sanding entire cowling in prep for pin hole filling. |
||