Date:    3-21-2010
Number of Hours:    9.00
Brief Description:    cowling
filled firewall to cowl gap with superfill, sanded to flush. shaped the inlets and spinner ring to match the prop spinner using a rasp and sandpaper. Re-drilled the attach screws at the fwd section of the cowl and added blind nuts. began sanding entire cowling in prep for pin hole filling.