Date:    1-26-2010
Number of Hours:    3.00
Brief Description:    canopy
assembled the canopy latch system, prep'd all the parts, drilled the holes and attached to the canopy frame for trial fit. The frame hole had a lot of powder coating inside the hole so I spent a bit of time cleaning this out.