| Date: |
4-6-2010 |
|
| Number of Hours: |
3.90 |
|
| Brief Description: |
interior side panels |
|
|
installed both interior side panels with 3/32" blind rivets. Prepped and painted the interior canopy frame and bow with Rustoleum Hammered Spray paint. Filed down the canopy retaining pin to ensure smooth operation of the canopy. |
||