Date:    4-15-2010
Number of Hours:    3.00
Brief Description:    landing gear intersection fairings
reinstalled the gear leg and wheel fairings in prep for installing the intersection fairings. First I drilled and installed 1/4 degree shims on both axels due to a slight toe-in on both wheels.