| Date: |
4-15-2010 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
landing gear intersection fairings |
|
|
reinstalled the gear leg and wheel fairings in prep for installing the intersection fairings. First I drilled and installed 1/4 degree shims on both axels due to a slight toe-in on both wheels. |
||