| Date: |
3-7-2009 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Left Wing Conduit |
|
|
routed wiring conduit through left wing and zip tied twice at each rib. Drilled small hole in conduit and placed a grommet in the hole for the dynon heated AOA/Pitot tube controller wires. soldered 16G colored wire to the dynon controller, heat shrink over solder joint and routed through the conduit to the root of the wing. |
||