Date:    3-1-2009
Number of Hours:    1.00
Brief Description:    PITOT and AOA lines
Routed both the A/S and AOA lines from the Dynon heated PITOT/AOA probe. Installed snap bushings in all ribs and guided the lines through the snap bushings.