| Date: |
3-1-2009 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
PITOT and AOA lines |
|
|
Routed both the A/S and AOA lines from the Dynon heated PITOT/AOA probe. Installed snap bushings in all ribs and guided the lines through the snap bushings. |
||