| Date: |
7-12-2010 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Pitot tube and plumbing |
|
|
Installed the dynon heated pitot/aoa probe with all the correct nylo plumbing and labeled each connection for easy reference. I secured the heat controller wires with clamps inspected the flight control bellcranks and closed up the access panel with SS screws and SS tinerman washers. |
||