Date:    7-12-2010
Number of Hours:    3.00
Brief Description:    Pitot tube and plumbing
Installed the dynon heated pitot/aoa probe with all the correct nylo plumbing and labeled each connection for easy reference. I secured the heat controller wires with clamps inspected the flight control bellcranks and closed up the access panel with SS screws and SS tinerman washers.