| Date: |
10-13-2012 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Install Drag Wire Jam Nuts & Install Diagonal Cros |
|
|
Rechecked drag wire tension, rechecked wing square at cross tube # 2, rechecked wing for straightness. Installed jam nuts on drag wires using red Loctite. Completed Log & Inspection Sheet Wing # 5. Trimmed diagonal cross tube, match drilled, deburred, installed hardware, torqued to spec and torque sealed. |
||