| Date: |
9-4-2013 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
F-28 |
|
|
Installed F-28 bulkhead. Clamped block of wood on both sides of fuselage at the correct distance from F-22. Floxed in place and clamped for cure. After cure laid the required BID layers on aft side. |
||