Date:    9-4-2013
Number of Hours:    1.00
Brief Description:    F-28
Installed F-28 bulkhead. Clamped block of wood on both sides of fuselage at the correct distance from F-22. Floxed in place and clamped for cure. After cure laid the required BID layers on aft side.