| Date: |
12-28-2014 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
HS skeleton |
|
|
Cleaned the workshop and then match drilled the 2 inboard nose ribs and inspar ribs to the forward HS spar. Clecoed the rest on the nose ribs to the forward HS spar ready for match drilling. |
||