Date:    12-28-2014
Number of Hours:    2.50
Brief Description:    HS skeleton
Cleaned the workshop and then match drilled the 2 inboard nose ribs and inspar ribs to the forward HS spar.

Clecoed the rest on the nose ribs to the forward HS spar ready for match drilling.