| Date: |
11-4-2014 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
rudder |
|
|
after much clean-up of dust from the compressor box construction (MDF produces infinite dust) I finally got back to the rudder. Riveted the Lower rudder rib assembly and the spar assembly. The three K1000-6 nutplates were primed with the same Tremclad Pro used on surfaces of the vertical stabilizer. |
||