Date:    11-4-2014
Number of Hours:    2.00
Brief Description:    rudder
after much clean-up of dust from the compressor box construction (MDF produces infinite dust) I finally got back to the rudder. Riveted the Lower rudder rib assembly and the spar assembly.

The three K1000-6 nutplates were primed with the same Tremclad Pro used on surfaces of the vertical stabilizer.