Date:    4-19-2014
Number of Hours:    2.50
Brief Description:    Alodining VS skeleton
alodined the long parts of the VS skeleton using my troughs. By good luck (not design) about 3 gallons fills the troughs, so I am able to get good depth in each of the troughs. This made alodining the VS spars and spar doublers very easy.

The drain valves in each trough also means that I can handle the chemicals with minimum spillage - a very good thing.