| Date: |
9-28-2008 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Changing bolts in venter section. |
|
|
Changed the bolts going through the center section from AN4-12A to AN4-13A's as they were not long enough., also routed some of the wireing fro the instrument panel. |
||