| Date: |
4-15-2007 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Mating the top- and lower colwing to each other. |
|
|
I located and clecoed a piece of alum strip to the bottom cowling, I then fit the top cowling and drilled and clecoed where the #6 screws will go. |
||