Date:    2-5-2006
Number of Hours:    3.00
Brief Description:    Located,drilled,and clecoed the fresh air NACA ven
I located the pattern on the outside of the fuselage and drilled the rivit holes, I then located the NACA vent on the inside and deilled through them useing the rivit holes as a templet.