| Date: |
3-19-2005 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Match drilling holes to the J channels. |
|
|
After assembling the rear of the fuselage with the J channels trimmed to fit, I drilled all the matching holes with the four J channels in line. |
||