Date:    7-11-2010
Number of Hours:    6.00
Brief Description:    Assembled elevator trim and servo motor
Assembled elevator trim and servo motor, finished drilling the holes out for the A4 rivets. Ready to disassemble, debur, and Cortec the surfaces before assembling and riveting the elevator.