| Date: |
7-11-2010 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Assembled elevator trim and servo motor |
|
|
Assembled elevator trim and servo motor, finished drilling the holes out for the A4 rivets. Ready to disassemble, debur, and Cortec the surfaces before assembling and riveting the elevator. |
||