| Date: |
1-24-2006 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Right wing rib prep |
|
|
Disassembled right wing structure and deburred all holes. Used Unibit in drill press to drill 13/16" holes in all ribs for wiring conduit. Conduit will be used to run wires to nav, strobe, and landing lights. Began sanding ribs for primer application. |
||