| Date: |
2-12-2010 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Hardware Install |
|
|
I removed all the hardware from the left wing in order to apply polyeurethane to all the bolt holes. With everything reinstalled I can adjust tension on my drag/anti-drag cables. |
||