| Date: |
3-23-2010 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Installed Leading Edge and Spar Wedges |
|
|
Installed leading edge and capped bolt holes with 3/8" dowel. I will trim and sand the dowel after the epoxy cures. I also glued the spar wedge spacers in place. |
||