| Date: |
6-14-2016 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Ont the Gear |
|
|
Reinstalled the gear while the fuselage was upside down for pain on the belly, which allowed us to flip off ot the sawhorses and back onto the gear. |
||