| Date: |
3-14-2016 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Paint Coat |
|
|
Applied first coat of paint. I alternated top and bottom coats each day (top in the morning, bottom in the evening), applying the same as I did with the control surfaces, using a 3” foam brush and sanding with 1000 grit sandpaper after 2 coats, then finishing with two top coats. |
||