Date:    8-11-2013
Number of Hours:    1.50
Brief Description:    Forming Lift Strut Fittings
Tyler and I formed the flat steel straps that will be used for the lower lift strut fittings. He operated the mandrel, which was a piece of a scrapped QMR test fixture... I operated the heat and hammer.