Date:    7-7-2014
Number of Hours:    1.50
Brief Description:    Section 24: Rollover Structure & F-1207 Bulkhead
Steps 1-3
Installing the turtle deck
Cleco'd the right and left turtle deck skins to the fuselage and tailcone assembly
Cleco'd the aft window underneath the turtle deck skins
Match drill the 3/32" holes from the aft window into the rollbar frames