| Date: |
7-7-2014 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Section 24: Rollover Structure & F-1207 Bulkhead |
|
|
Steps 1-3 Installing the turtle deck Cleco'd the right and left turtle deck skins to the fuselage and tailcone assembly Cleco'd the aft window underneath the turtle deck skins Match drill the 3/32" holes from the aft window into the rollbar frames |
||