| Date: |
10-8-2013 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
29a-05d |
|
|
Steps 6-8 Completed match drilling #30 holes in longerons Match drilled holes common to panel base and canopy ribs Final drilled #30 holes common to the engine mount brackets and the panel base |
||