| Date: |
10-7-2013 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
29a-05c |
|
|
Steps 5-6 Attached nut plates to F1202B panel base Clico'd the F1202 panel base to the F1201A firewall upper and match drilled #30 the holes common between the panel base and the longerons |
||