| Date: |
10-2-2013 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
29a-05a |
|
|
Steps 1-4 Separated the panel attach strip Fabricated the strut attach angle Completed the dimpling and countersinking of all nut plate attach holes on the F1202H L&R canopy ribs Final drilled the center fastener locations in the canopy attach doublers and canopy ribs |
||